A study design was prepared for developing the blocks on the two sides of the Bodrog Department Store. After the first version in 1976, a new plan was developed in 1980 that envisages a block on one side of the store only. Using Imre Makovecz’s development plan as a basis, István Ferencz, Csaba Bodonyi, Ágnes Kravár and Ervin Nagy also prepared building designs, as did Imre Makovecz himself. The construction of these buildings was completed in 1987-88. After the implementation plans prepared in 1989-90 were reviewed, the designs of the buildings that close off the block from the rear side were drawn up in 1995 but never got implemented.