A study design was prepared about the National Riding Hall and a commercial, cultural and sports complex to be built in an area formerly used by the army in Budapest’s Pasarét section. As part of the complex, the building permit plan of the riding hall was elaborated by Imre Makovecz, that of the sports centre by Sándor Pálffy and Zoltán André, of the hotel by Lőrinc Csernyus and József Siklósi, of the office building by Attila Turi and of the residential buildings by Tibor Bata. The roof structure in the design is identical to that of the already implemented auditorium maximum at Piliscsaba.