First a study plan was prepared for the exhibition and storage building of the Calvinist church’s library, then an implementation plan was drawn up by Ervin Nagy in 1983.
First a study plan was prepared for the exhibition and storage building of the Calvinist church’s library, then an implementation plan was drawn up by Ervin Nagy in 1983.