József Siklósi and Tibor Fülöp took part in preparing the deployment plans. The building permit plans for the refreshment house and the spa were prepared by Judit Gerencsér Varga, Tamás Dobrosi, Tamás Dósa Papp, Imre Balázs Arnóczi, Pál Salamin and Márton Tóth in 2009. The design sketch of the hotel was drafted in 2010, subsequently developed into a plan drawing by Judit Gerencsér Varga.